New Resource Area

North Beckton Primary School

Work on the new school resource area commenced in early 2020. During the demolition phase, the Covid-19 pandemic struck the UK, and the country entered national lockdown. At the request of the Education Authority, Every Project Counts was asked to continue with the works under strict safeguarding and safety measures. Following full consultation with our staff and operatives, the decision was taken to proceed, with the team demonstrating exceptional commitment during such an uncertain time.

The project involved the complex infill of an existing swimming pool, installation of a new Building Management System (BMS), replacement roofing, and the addition of skylights to bring natural light into the space. A dedicated soft play area was created, alongside the total refurbishment of a large section of the school, transforming it into a vibrant, modern, and flexible resource area.

Despite the significant challenges posed by Covid-19, EPC successfully delivered this intricate scheme to an exceptionally high standard. The project was completed on time, within budget, and has provided the school community with a safe, innovative, and high-quality facility that will serve staff and pupils for years to come.

Value: £400,000
Date: January 2020
Download Brochure

What our clients
are saying.

crossmenuchevron-leftchevron-right linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram