SEND Conversion

Upton Cross School

Every Project Counts was appointed to deliver the conversion and remodelling of the main building at Upton Cross School, transforming existing spaces into high-quality SEND facilities. The works included full M&E upgrades, new classrooms, specialist WC and hygiene rooms, a kitchenette, soft play and sensory areas, and associated external works.

The project presented unique challenges, as all works were carried out during term time with the school fully occupied. This required careful phasing, strict health and safety controls, and all operatives to hold enhanced DBS clearance. Noise, dust, and safeguarding measures were given the highest priority to ensure minimal disruption to pupils and staff.

Key elements of the scheme included extensive strip-out, new partitioning, plumbing and drainage installations, mechanical and electrical upgrades, and bespoke joinery. High-quality finishes such as hygienic wall cladding, Altro safety flooring, and IPS panel systems were installed to meet both regulatory standards and the needs of the pupils. External works included new secure fencing and the creation of safe play areas.

Value: £240K
Date: 6 weeks
Download Brochure

What our clients
are saying.

crossmenuchevron-leftchevron-right linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram